Construction Musings
Feb 5th, 2010 Posted in Roundabout Construction Blog | no comment »Today, we hear the cement trucks and other work trucks working across and down the street putting in sidewalks and curbs. Perhaps they will finish ours today, too, with all this nice weather for working. Not quite sure what comes next, but the telephone and utility lines have all been moved, at least in our area, so the extra poles should come down soon. Traffic continues to be very good ~ no slowdowns with all of the work being done on the sides of the road.
We’re trying to decide where to put our sign, as they should be wanting to get it out of the way soon. There isn’t a whole lot of room for it up the hill in front of the store. Anyone have any ideas? We need it to be visible from both directions and, of course, from the roundabout. We’re also working on a landscape plan for the front area ~ and a new sign for the front of the building. Steve made some new shutters for the east side of the building and we need to paint the trim on that side soon. Things will look a bit different in the next couple of months, so stay tuned.

